VB Zone VB-41: 11.2 meters at 1.86% Ni, 0.26% Cu and 0.05% Co (2.08% NiEq), including 5.0 meters at 3.71% Ni, 0.13% Cu and 0.09% Co (4.00% NiEq) Interval includes 1.9 meters of massive-sulphide textures grading 7.09% Ni, 0.18% Cu and 0.18% Co (7.61% NiEq) VB-52: 25.9 meters at 0.69% Ni, 0.18% Cu and 0.02%...
October 13, 2024